TopSolid'ShopFloor integrates directly into production environments. Its installation must therefore take into account shop floor constraints, industrial workflows, and machine control systems.
Deploying a ShopFloor environment requires careful consideration of shop floor organization, connected equipment, and interactions with your existing TopSolid environment to ensure a reliable go-live.
Check Your System Requirements
Make sure your environment meets the recommended requirements before deploying TopSolid'ShopFloor.
TopSolid'ShopFloor Licensing and Activation
Installing TopSolid requires specific license codes. These codes are provided to you by your sales contact after the contract is signed and before your environment is installed.
Install TopSolid'ShopFloor
Installing ShopFloor involves deploying workstations on the shop floor, connecting them to the central environment, and configuring production workflows.
This stage helps validate the consistency between the software environment, production equipment, and real-world operational requirements before go-live.
Update TopSolid'ShopFloor
Keep your TopSolid'ShopFloor environment up to date to benefit from the latest corrections, improvements, and product updates.
Updates require at least one workstation to be connected to the internet. To avoid disrupting production, plan updates outside operating periods and ensure the relevant environment is available before deployment.
Need Technical Assistance?
Our technical support teams can help you with
installation, updates, and technical issues related to your TopSolid environment.